title: Reopening a gate with rulings
description: Every way a person rules on a play after it starts. Approve with rulings, reject and approve the replan in one step, accept a Verify or Audit finding, and void a gate that already passed.
---

**Verification:** verified on the twin, except `gw accept` (details at the bottom).

Gates are where your judgment enters the play, and the engine keeps that judgment on the record. Every approval is a signed file holding a hash of the artifacts you reviewed. If those artifacts change afterwards, the approval no longer counts. Your rulings are written to the play's `feedback/` folder in your own words, and later stages must follow them where they differ from the plan.

This page covers the five moves, from the lightest to the heaviest.

| Situation | Command | Where the play goes |
|---|---|---|
| Gate A, the planner asked you something | `gw approve <play> --gate A --comment "<rulings>"` | Build, with your rulings as feedback |
| Gate A, the plan is wrong in a way you can state | `gw reject <play> --gate A --comment "<what to change>" --approve` | Plan, then straight on to Build unless the replan raises something new |
| Gate B, the draft needs a fix | `gw reject <play> --gate B --comment "<what to fix>"` | Build |
| Verify or Audit stopped on something only you can decide | `gw accept <play> --comment "<what you accept and why>"` | On, with your acceptance shown at Gate B |
| A passed gate turned out wrong | `gw reopen <play> --gate A\|B --comment "<rulings>" [--approve]` | Plan (A) or Build (B) |

## 1. Rulings at Gate A

When the planner hits a decision that's yours, it writes `needs-ruling.md` instead of guessing. Requirements Research couldn't resolve show as **blocked** in `gw show`. Either way, the gate tells you:

```text
$ gw show acme/rule-01
the planner needs your ruling (needs-ruling.md):
  # Needs your ruling
  1. The seed AE or the candidate territory owner approves? Recommended: seed AE.
next: Rule on …/needs-ruling.md (or the blocked requirements), then: gw approve acme/rule-01 --gate A --comment "<your rulings>"
      ·  or replan: gw reject acme/rule-01 --gate A --comment "<rulings>" --approve
```

A plain approval is refused, because approving past an open question would drop it:

```text
$ gw approve acme/rule-01 --gate A
gw: Gate A has decisions only you can make: the planner's questions in needs-ruling.md.
    Approve with --comment "<your rulings>" (for example "1-4 as recommended"), or reject with --comment to replan.
```

Two ways forward:

```bash
# The plan is right once your rulings are applied: approve with them. Build follows the rulings where they differ from plan.md.
gw approve acme/rule-01 --gate A --comment "1: seed AE approves, as recommended"

# The rulings change the plan: replan, and let your ruling approve the new plan.
gw reject acme/rule-01 --gate A --comment "Seed AE approves; fit threshold 65" --approve
```

With `--approve`, the replan is approved in your name, citing your ruling, unless the planner writes a new `needs-ruling.md`. Then it stops at Gate A again. On the twin, the approval file reads:

```json
{ "gate": "A", "decision": "approved", "by": "<you>",
  "comment": "Approved by ruling (--approve, 2026-11-28T22:30:10.442Z): Seed AE approves; fit threshold 65",
  "artifactHash": "766c6eeb…", "mac": "1fce9036…" }
```

Good rulings are short, numbered to match the questions, and testable: "1: seed AE. 2: threshold 65. 3: no competitor variant."

## 2. Fixes at Gate B

Gate B approves publishing one exact snapshot. If the draft needs a change, reject with the fix and the play goes back to Build. Verify and Audit run again on the new snapshot:

```bash
gw reject acme/rule-03 --gate B --comment "Rep task due next business day, not same day"
```

`--approve` never applies at Gate B. Publishing always needs your explicit approval:

```text
$ gw reopen acme/rule-02 --gate B --comment "…" --approve
gw: --approve applies to Gate A only; Gate B (publishing) always needs your explicit approval
```

## 3. Accepting a finding

Verify fails an assertion it can't fix itself, or Audit raises a `needs_human` finding: the play stops (`manual`, "Needs a human: …"). If you accept the finding, say what and why:

```bash
gw accept acme/champions-01 --comment "A7 can't be tested before the first production batch; we run it supervised with the switch OFF"
```

Your acceptance is recorded in your name and shown at Gate B. Accepting covers only what needs a human. Defects the stage could fix itself still go back to Build, with your ruling beside them. Accepting never waves them through.

## 4. Reopening a gate that already passed

Sometimes the problem shows up late. Verify finds the approved contract was wrong, or the budget runs out. `gw reopen` voids the passed gate with a signed `rejected` record that gives your reason, writes your rulings as feedback, and sends the play back to Plan (Gate A) or Build (Gate B).

On the twin, with `maxCreditsPerPlay: 10`, a second Verify pass ran out of budget:

```text
acme/rule-03  Verify · blocked · Verify: … {"error":{"code":"budget_exhausted","message":"play acme/rule-03 has spent 15 of its 10 credit budget; ask a human to raise maxCreditsPerPlay"}}
```

Reopen Gate A with your ruling, and approve the replan in the same step:

```bash
gw reopen acme/rule-03 --gate A --comment "Fit threshold 65; keep the cap" --approve
```

The play replans, the ruling approves the new plan, and Build and Verify run again. Here Verify blocked again, because spend is still over the cap. Raising `maxCreditsPerPlay` in `factory.yaml` is the human fix for that, and `gw retry` resumes:

```bash
gw retry acme/rule-03
# acme/rule-03  Gate B · gate · Gate B: approve publishing wf_twin110 at snapshot snap_twin126 · 1 assertion unverified
```

The cap is checked before each spend-class Clay call, so one call can take a play past it. The next one is refused.

### When reopen refuses

| Message | Why | Instead |
|---|---|---|
| `… is waiting at Gate A, so there is nothing to reopen` | The play is at the gate | `gw approve … --comment` or `gw reject …` there |
| `… is stopped; reopen a gate only on a blocked or manual play` | You took it off the board with `gw stop` | `gw retry <play>` puts it back where it was, then reopen |
| `… is gate` / `… is ready` | Reopen works only on a play that stopped for a human (blocked or manual) after the gate | Wait for it to stop, or rule at the next gate |
| `… hasn't passed Gate A` | Nothing to void | Answer the questions, or `gw retry` |
| `Reopening a gate needs a comment` | Rulings are the point | `--comment "<rulings>"` |

## 5. Stopping and resuming

`gw stop <play> --comment "why"` takes a play off the active board. Nothing advances it until `gw retry`, which puts it back exactly where it was: waiting on questions, at a gate, or blocked. Stopping also withdraws a standing `--approve`, so a later retry never approves a plan you haven't seen.

```bash
gw stop acme/lal-cap --comment "AE team on offsite until Monday"
gw retry acme/lal-cap
```

## Where rulings live

| File | What |
|---|---|
| `plays/<client>/<play>/approvals/` | Signed approval and void records, with the artifact hash |
| `plays/<client>/<play>/feedback/` | Your rulings, rejections, reopen reasons and acceptances, in your words |
| `plays/<client>/<play>/events.jsonl` | `gate.decided`, `gate.reopened` and the rest, in order |
| `clients/<client>/decisions.md` | Decisions that should hold for every future play: record them with `gw client decide` |

If a ruling is really a client-wide rule ("never auto-enroll", "Slack alerts go to #ae-desk"), record it as a decision as well, so the next play doesn't ask:

```bash
gw client decide acme outreach.handoff "AE rep task with draft attached; never auto-enroll" --note "ruled on champions-01, Gate A"
```

## Verification

**Verified on the twin** (isolated factory). With a `needs-ruling.md` placed in the play folder by hand, `gw show` printed it, `gw approve --gate A` without `--comment` was refused with the message above, and `gw reject --gate A --comment … --approve` replanned and approved in one step (the signed approval's comment is quoted above). With `maxCreditsPerPlay: 10`: `gw approve --gate A`, then `gw reject --gate B --comment …`, then Verify blocked on `budget_exhausted`; `gw reopen --gate A --comment … --approve` replanned, approved and blocked again on the cap; after raising the cap, `gw retry` reached Gate B. Also checked: `gw reopen --gate B --approve` refused, `gw reopen` on a stopped play refused, and `gw stop` then `gw retry` resumed.

**Not run:** `gw accept`. The twin's scripted Verify and Audit never stop for a human, so its text comes from `src/core/engine.ts` (`acceptFindings`). A real planner writing `needs-ruling.md` itself was also not run.